Bug #2188
openAggregated Timesheet [Projects]: Open the downloaded CSV file, and the 'Grand Total' column is missing.
0%
Description
Steps:
1. Login to Lauditor.
2. Click on the Timesheet module on the left side.
3. Select the "Aggregated Timesheets" tab.
4. Click on the "Project" tab.
5. Choose either "Week" or "Month."
6. Click on the "Download as CSV" button.
7. Open the downloaded CSV file.
8. The "Grand Total" column is missing.
Link - https://drive.google.com/file/d/1XYWVeXcW78mq51P2xzONqu9s8Mb4tBtv/view?usp=drive_link
Updated by Ananth Kumar about 1 year ago
- Subject changed from Ag to Aggregated timesheet(Projects): Download the CSV file. The grand total is missing.
- Priority changed from Normal to High
Updated by Vengadeshwaran R 4 months ago
- Subject changed from Aggregated timesheet(Projects): Download the CSV file. The grand total is missing. to Aggregated Timesheet [Projects]: Open the downloaded CSV file, and the 'Grand Total' column is missing.
- Description updated (diff)
Updated by Soundarya Vembaiyan 4 months ago
- Status changed from New to Resolved
- Assignee set to Ananth Kumar
Updated by Vengadeshwaran R 4 months ago
Steps:
1. Login to Lauditor.
2. Click on the Timesheet module on the left side.
3. Select the "Aggregated Timesheets" tab.
4. Click on the "Project" tab.
5. Choose either "Week" or "Month."
6. Click on the "Download as CSV" button.
7. Open the downloaded CSV file.
8. In the Grand Total column, some fields are empty and "undefined" text appears. Valid data should be displayed instead.
Link - https://drive.google.com/file/d/1E3_ZOj2lSySLmdy0BY8-B06Pyfe_b-01/view?usp=drive_link
Updated by Vengadeshwaran R 3 months ago
- Assignee changed from Soundarya Vembaiyan to muskan mathur
Updated by Soundarya Vembaiyan 1 day ago
- Status changed from New to Resolved
- Assignee changed from muskan mathur to Vengadeshwaran R
Updated by Neela Chinnappa about 10 hours ago
Testing is only possible when the issue 4181 is fixed.