Project

General

Profile

Actions

Bug #6704

open

Timesheets - All-day event adds only 30 minutes to timesheet initially and updates to 23:59 on edit

Added by Neela Chinnappa 2 days ago.

Status:
New
Priority:
Normal
Assignee:
Start date:
01/23/2026
Due date:
% Done:

0%

Estimated time:

Description

Steps to Reproduce

  • Create an All-day event.
  • Enable Add to Timesheet.
  • Save the event.
  • Check the created timesheet entry.
    only 30 minutes is added to the timesheet.
  • Edit the same all-day event again and save.
  • Check the timesheet entry after editing.

After editing the same event, the same entry is updated to 23:59.

If all day event is created, related timesheet entry should be added as 23:59

https://drive.google.com/file/d/1uW-A8eZd8UGdEiyvqZmaKhr8cHf7baTd/view?usp=drive_link

No data to display

Actions

Also available in: Atom PDF